
Several town councils and municipal services have communicated water outages and incidents in the supply due to maintenance work, network improvements or unforeseen breakdowns. The actions affect Zaragoza, Guadalajara, Castro Urdiales, Huesca, Ceuta and Tenerife, with limited schedules and detailed streets in most cases.
In view of these interventions, the authorities recommend plan essential consumption and have stored water to cover basic needs during the indicated periods. It is also suggested consult the official channels to follow the latest news of each cut.
Zaragoza: scheduled power outages and official notices
Zaragoza City Council has made progress occasional interruptions in supply in different neighborhoods throughout the week due to work on the supply network, with special impact on the city center.
For August 28th, XNUMX Damage is expected in the center and on various streets in Arcosur, as part of the planned maintenance plan. Users are asked to exercise caution and prepare household reserves while the work is being carried out.
Looking August 29th, XNUMXThe council details several closures by time slot. Below are the planned streets and time slots:
- C/ Genoveva Torres Morales (between C/ Moncasi and C/ Doctor Lozano Monzón): from 8:00 a.m. to 18:00 p.m.
- Doctor Lozano Monzón Street (No. 6, 8 and 10): from 8:00 a.m. to 18:00 p.m.
- C/ Lapuyade (from Pº Cuéllar to C/ Génova) and Pº Cuéllar nº 45: from 8: 00 to 10: 00.
- C/ Santa Isabel: from 10: 00 to 12: 00.
- Plaza del Justicia No. 9: from 10: 00 to 12: 00.
- C/ Alfonso I nº 29: from 10: 00 to 12: 00.
- C/ Moncasi (even-numbered side), between C/ Arzobispo Doménech and C/ Genoveva Torres Morales: from 8:00 a.m. to 18:00 p.m.
La duration is approximate and the service will be restored once the work is completed. The City Council will provide the exact notifications in X (formerly Twitter) and maintains up-to-date information on zaragoza.es.
Guadalajara: Evening court at Brianda de Mendoza and Luna
The Guadalagua company has reported a supply cut on August 28, between the 17:00 and 20:00, due to maintenance work on the network. The incident affects the streets Brianda de Mendoza and Luna, Specifically the No. 57 and 65 to 107 (odd).
Once the intervention is completed, the supply will be restored the same afternoon, without prejudice to small pressure fluctuations during the start-up of the service.

Castro Urdiales: work on the general network from 08:00 a.m. to 12:00 p.m.
From the Castro Urdiales Water Service a report is communicated power cut on Thursday, August 28, planned between 08:00 and 12:00, to carry out work in the general network.
- Menéndez Pelayo Street (from no. 27 to 46)
- C/ María Aburto
- Bajada de la Arboleda Street
- C/ Portus Amanus
- C/ Flaviobriga
- C/ Ocharan Mazas (No. 22, 24 and 26)
Once the work is completed, service will resume without individual notice. There may be episodes of turbidity and pressure drops; it is recommended to avoid food use of water as long as they persist.
Huesca: intervention on the Montearagón pipeline
The General Services of the Huesca City Council report a Cut-off from 7:00 a.m. on Tuesday, August 26 for works related to Magantina Industrial Estate, which can generate pressure interruptions and variations in different parts of the city.
El reinstatement will be produced upon completion of the work. Neighbors are advised plan water use and be alert to possible incidents during the day.
Ceuta: Residents complain about repeated interruptions
In the neighborhood Juan Carlos I, block 37 was left without water since early Monday afternoon, second interruption in less than a weekResidents denounce lack of information and difficulties in daily tasks, pointing out that the public company Acemsa send to claim the next day.
Local formations such as Ceuta Now! demand 24-hour notice when the cuts are scheduled and immediate communication in unforeseen breakdowns, demanding dignified treatment and effective solutions for the periphery.
Tenerife II: Protests over supply problems at the prison
The staff of the Tenerife II Penitentiary Center has demonstrated to demand a solution to the water cuts affecting the center. The union TAMPM warns of risks to security and operational stability if urgent measures are not taken.
The prison has a insufficient cistern for a population that consumes around 270 cubic meters per day. No improvements or storage expansions have materialized, they claim, while the mayor of El Rosario has criticized the lack of state progress by recalling that the center shares hydraulic infrastructure with the municipality.
With actions already underway and others planned, it is advisable Check if your street is affected, note the schedules y reserve water for the basics; The official channels Each city council and management company disseminates the notices and, once the work is completed, the service is gradually normalized.
